Users Also Read
MCQ's Search Engine
Electrical Engineering
Mechanical Engineering
Civil Engineering
Automobile Engineering
Chemical Engineering
Computer Engineering
Electronics Engineering
Medical Science Engg
Define the followin? Average demand, Maximum demand, Demand factor, Load factor.
Average Deman? the average power requirement during some specified period of time of considerable duration is called the average demand of installation.
2.\tMaximum Deman? The maximum demand of an installation is defined as the greatest of all the demand, which have occurred during a given period. It is measured accordingly to specifications, over a prescribed time interval during a certain period.
3.\tDemand Facto? It is defined as the ratio of actual maximum demand made by the load to the rating of the connected load.
4.\tLoad Facto? It is defined as the ratio of the average power to the maximum demand.
2.\tMaximum Deman? The maximum demand of an installation is defined as the greatest of all the demand, which have occurred during a given period. It is measured accordingly to specifications, over a prescribed time interval during a certain period.
3.\tDemand Facto? It is defined as the ratio of actual maximum demand made by the load to the rating of the connected load.
4.\tLoad Facto? It is defined as the ratio of the average power to the maximum demand.