Civil Engineering ⇒ Topic : Water Demand / requirements
|
April
| |
Demand of water depends upon number of
people in a town or city. For forecasting of
population various methods are used. They are :- 1. Arithmetical increase method 2. Geometrical increase method The water requirements for an average
Indian town may be taken as follow :-3. Incremental increase method 4. Decreasing, rate of growth method 5. Logistic curve method The domestic demand is about 50% of the total consumption. | |
| |
!! OOPS Login [Click here] is required for more results / answer